Ulua progress: 1 month, 12 days

ulua_molds-1024.jpg
Ulua strongback, stem molds, and station molds

strips-1024.jpg
Tube containing 60ea 1″ x 1/4″ x 20′ western red cedar bead-and-cove strips from BC Wood Strips.

  • completed and set up strongback on legs
  • received cedar strips for vaka hull
  • fabricated cleats and mold extensions
  • purchased and set up floor-standing drill press
  • jigsawed out stem and station molds (still need to belt sand to final dimension)
  • 99% determined that we will leave the hull in natural finish with mahogany for stems, ‘wales, seats, etc.

0 Responses to “Ulua progress: 1 month, 12 days”


  1. No Comments

Leave a Reply