![]()
Ulua strongback, stem molds, and station molds
![]()
Tube containing 60ea 1″ x 1/4″ x 20′ western red cedar bead-and-cove strips from BC Wood Strips.
- completed and set up strongback on legs
- received cedar strips for vaka hull
- fabricated cleats and mold extensions
- purchased and set up floor-standing drill press
- jigsawed out stem and station molds (still need to belt sand to final dimension)
- 99% determined that we will leave the hull in natural finish with mahogany for stems, ‘wales, seats, etc.
0 Responses to “Ulua progress: 1 month, 12 days”